ADNOC Projects

Project: H&G onshore facility Pkg. 2: Fabrication and Erection of structure at DC1, DC4, DC6, HLE.
Client: Tecnimont, ADNOC
Contractor: Emarat Alula / Ali and Son’s (2025 ongoing)
Project: DGD: Erection of Steel Storage Tank, Piping and Piping support and interconnected tie-in joints at Arzhana Island.
Client: ADNOC OFFSHORE
Contractor: Emarat Alula (2025 ongoing)
Project: H&G offshore facility Pkg. 1 – Design, Fabrication and Erection of Piping, ducting, supports, electrical, instrumentation, structure, equipment etc. Supply and installation of electrical & Instrumentation wiring, panels and termination at DC1, DC4, DC6, HLE.
Client: ADNOC, NPCC, SAIPEM
Contractor: Target (2024 ongoing)
Project: Jebel Ali Pilot Project (O & G) – Install a Pilot Production Facility (PPF) to export 12 MMSCFD (dry basis) gas which will be routed to a nearby pipeline facility (Dolphin). Piping, Pipeline, Civil, firefighting, MEP all works at Abu Dhabi, UAE.
Client: ADNOC
Contractor: JEREH (2021 to 2022)