Scope: The project involves dismantling, disassembly, and demolition of the existing facility, and followed by design, engineering, fabrication, erection and constructing of the new plant, including piping, equipment, ducting, steel structures, and E&I works. All activities follow quality, safety, and environmental standards to ensure timely commissioning and handover.
Project: Meram Civil Concrete work for the pipeline pulling work includes Survey, Excavation and backfilling, pipeline pulling, Equipment erection, Concrete etc. at Habshan, Abu Dhabi, UAE.
Client: TR, ADNOC
Contractor: TARGET (2024 ongoing)